Challenge: Extremely Challenging Entitlement and Permit processes
Challenge: Zoning with restricted covenants; savvy authorities having jurisdiction.
Challenge: Tornado Alley; Multi-Story Buildings
Challenge: Third Building in a campus with extremely tight site. Required very close coordination between design and construction teams.
Challenge: This campus, developed in a mountainous area, required rock excavation and other challenging site conditions.
Challenge: In development since 2006, this coastal, hurricane prone campus required seismic considerations.
Challenge: 2‑story addition to an existing and active Data Center.
Mustang Business Park features three buildings ranging in size of 76,000 sf to 173,000 sf.
Northwest 75 Bldg A and B are examples of a design that consists of concrete tilt-up panel buildings utilizing various custom colors and shapes with alternating depths providing visual interest to the façade. Multi-height …
Project 50 was a build-to-suit for Five Below. It has an office component, break room, shipping and receiving office as well as traditional racking, material handling equipment, mezzanines and pick modules.